Renovation costs, Australia

How much does a bedroom renovation cost in Australia?

The figures below price a 12 m² bedroom floor in eight interior styles, plus two coats of paint across 28 m² of walls, a style-matched light and real bed and furnishing picks from Australian suppliers. Each total comes straight from the costing engine behind the TuttoCasa app: tiles by the box with wastage built in, adhesive, grout, paint and laying labour at dry-area rates.

Bedroom renovation cost by style

Based on a 12 m² floor, priced live from current supplier data. AUD, ex-GST.

StyleThe lookEstimated total
BiophilicRaw stone, living green, timber grain, nature brought inside$4,266
IndustrialExposed concrete, raw steel, black pipe, warehouse meets home$4,391
French ProvincialCream cabinetry, carved timber, aged brass, effortlessly romantic$4,403
ContemporaryClean lines, neutral palette, the reno everyone wants right now$4,463
Modern CoastalSandy neutrals, pale oak, honed stone calm$4,509
Dark & MoodyCharcoal tiles, matte black tapware, cave-like drama$4,870
Modern HamptonsWhite shaker, honey oak, marble bench, matte black tapware$4,900
Modern FarmhouseWhite subway, shaker doors, black iron handles$5,141
Hotel LuxeBook-matched marble, brushed gold, freestanding bath$5,239
Mid-Century ModernTerrazzo, bold colour, tapered legs, retro confidence$5,340
Modern ClassicHalf traditional, half modern, warm, timeless, never trendy$5,381
Warm MinimalistVein-cut travertine, warm greige, honed everything$5,682
Neo-DecoCurves, fluted panels, zellige, jewel tones$6,843
JapandiWarm greige, matte stone, charcoal, zero gloss$7,014
Heritage ModernPeriod bones, marble, coloured joinery, brass$7,083
Earthy BohoTerracotta, zellige, rattan, layered earthy warmth$8,500
Modern MediterraneanSun-baked terracotta, limewash, soft arches$10,030
Earthy AustralianaSage, terracotta, brushed brass, raw clay$10,640
Cheapest

Biophilic at $4,266. Raw stone, living green, timber grain, nature brought inside.

Dearest

Earthy Australiana at $10,640, a spread of $6,375 across the eight styles for the same room.

What is included: an example schedule

Here is the full line-item schedule behind the Mid-Century Modern figure above. Covers floor tiling, grout, adhesive, wall paint at two coats, a style-matched light and real furnishing picks including the bed. Removal of old carpet, subfloor preparation and electrical work are excluded.

Material schedulebedroom · Mid-Century Modern
MATFloor: Portoro Boreale (600x600mm, matte)13 box @ $112$1,458
MATGrout: Kerakoll Fugabella Color 07 — Mid Grey for floor1 bag @ $45$45
MATAdhesive: Kerakoll Biogel No Limits (gel-technology, 25kg)2 bag @ $71$142
LABFloor tiling labour (bedroom, supply-fix band)12 @ $70$840
FURNoosa Queen Bed Frame1 item @ $849$849
FURSealy Posture Pacific Firm Queen Mattress1 item @ $549$549
FURWellard Natural Bedside Table2 item @ $399$798
FIXSputnik Brass Pendant 500, amber globes1 item @ $389$389
FIXEmerald Hill Hunter blockout eyelet, moss1 item @ $90$90
FIXWall paint — Dulux Natural White (low-sheen)6 L @ $16$98
FIXCeiling paint — Dulux Vivid White (flat)3 L @ $16$49
FIXTrim & door enamel — Dulux Vivid White (semi-gloss)2 L @ $16$33
Estimated total, ex-GST$5,340

On a tighter budget?

The same engine can work to a number. Give it a budget and it swaps the dearest tile lines for honest cheaper alternates, smaller formats or ceramic instead of porcelain, then steps the labour band down a tier if it still needs to. Asked to bring the Mid-Century Modern bedroom in at $4,539, it lands at $4,293, saving $1,047 against the standard schedule. The swapped lines are flagged as budget picks so nothing is hidden.

The costs that catch people out

Demolition and skip bins

Strip-out labour plus bin hire. Allow $800 to $1,500 for a wet area, less for a dry room.

Waterproofing

Mandatory in wet areas under the NCC. Allow $500 to $900 for a bathroom, $300 to $500 for a laundry.

Contingency, 15 to 20%

Walls and floors hide things: out-of-level slabs, old leaks, surprise plumbing. Price it in up front, not after.

Lead times

Imported stone and feature tiles run 3 to 6 weeks. Order when the schedule is locked, not when demolition starts.

Frequently asked questions

Tiles in a bedroom? Really?

Increasingly, yes, especially timber-look and stone-look porcelain in warmer parts of Australia. It is durable, allergy-friendly and cool in summer. If you prefer carpet or timber, treat the floor line in the schedule as your flooring allowance.

What drives the difference between styles?

Two things: the per-square-metre price of each style's floor tile, and the furnishings. A Neo-Deco scheme carries dressier lighting and furniture picks than a Warm Minimalist one, and that shows up in the total.

How long does a bedroom renovation take?

With no structural work: a day to strip the old floor coverings, one to two days of laying for 12 m², a day for painting, then furniture. Allow a week end to end once materials are on site, and order tiles 3 to 6 weeks ahead.

Are these prices GST inclusive?

No, all figures are AUD ex-GST. Add 10 per cent for GST and keep a 15 to 20 per cent contingency for the things the carpet was hiding.

Price your own room

See your bedroom in any of these styles

Photograph the room you have, pick a style, and get a photorealistic redesign with this exact schedule priced for your measurements. Free, in your browser.

Try it free